Case Study

135kWp Rooftop Solar PV Installation

Project overview

Engineering-led delivery, clearly documented

As part of the client's long-term decarbonisation programme, Veridis designed and delivered a 135kWp rooftop solar PV system that transforms unused roof space into a valuable renewable energy asset. The installation provides clean electricity directly to the facility, reducing reliance on imported grid power while improving energy resilience and supporting the organisation's environmental objectives.

Sector

Commercial & Industrial

Client

End User

Location

Services

Design • Consultancy • Renewable Energy • Project Delivery • Rooftop Solar PV • 135kWp

Project snapshot

Key project details

135kWp

rooftop solar PV

Multiple

string inverters

LV

infrastructure integration

On-site

renewable generation

The Brief

What the project needed to achieve

The client required a renewable energy solution that would:

  • Reduce carbon emissions across the site.
  • Lower long-term electricity costs.
  • Improve overall energy efficiency.
  • Maximise the available roof space.
  • Integrate safely with the existing low-voltage electrical infrastructure.
  • Provide a scalable platform for future energy technologies.

The project demanded careful engineering to ensure the new generation system could operate safely alongside the existing electrical installation while meeting all applicable industry standards and network requirements.

Engineering Challenge

The constraints behind the solution

Installing renewable generation onto an existing commercial building presents a number of technical challenges beyond simply mounting solar panels.

The available roof space was spread across multiple roof levels, requiring a carefully planned array layout to maximise generation while maintaining safe access routes for inspection and maintenance.

From an electrical perspective, the renewable generation system needed to be fully coordinated with the existing low-voltage distribution network, ensuring reliable operation without affecting the building’s normal electrical loads.

The design also needed to incorporate appropriate protection, isolation and monitoring systems, allowing the installation to operate safely throughout its lifecycle.

Our Solution

Specialist engineering from design to delivery

Veridis developed and delivered a complete turnkey engineering solution covering design, installation, commissioning and final integration.

High-Efficiency Solar PV Array

A 135kWp roof-mounted solar PV system was installed across multiple roof elevations, maximising available space while optimising annual energy production.

Advanced Inverter Architecture

Multiple string inverters were strategically deployed to improve system efficiency, increase operational resilience and provide comprehensive monitoring of system performance.

Dedicated Solar Switchgear

New AC and DC switchgear, protection equipment and isolation devices were installed to provide safe operation and maintenance while ensuring full compliance with current electrical standards.

LV Infrastructure Integration

The renewable generation system was integrated into the site’s existing low-voltage distribution network through a dedicated connection arrangement, allowing renewable energy to be utilised on-site without impacting normal business operations.

Project Highlights

What stood out

135kWp rooftop solar PV installation
High-efficiency photovoltaic modules
Multiple string inverter configuration
Dedicated solar switchgear and protection systems
Integration with existing LV electrical infrastructure
Renewable energy generation for on-site consumption
Designed and delivered with minimal operational disruption
Fully tested and commissioned

Services Delivered

Veridis scope

Electrical Engineering Consultancy
Feasibility & System Design
Solar PV Design
Detailed Engineering
Low Voltage Integration
Protection & Switchgear Design
Installation Management
Testing & Commissioning
Project Delivery

Results

Delivered outcomes

Reduced Carbon Emissions

The installation significantly reduces the site’s reliance on grid electricity, lowering operational carbon emissions and supporting the client’s wider net-zero strategy.

Lower Operating Costs

Generating renewable electricity on-site reduces imported energy consumption, helping deliver long-term operational savings while improving protection against rising energy prices.

Future-Ready Infrastructure

The electrical infrastructure has been designed to accommodate future technologies including battery energy storage systems (BESS), additional renewable generation and advanced energy management platforms.

Improved Sustainability Credentials

The project demonstrates the client’s commitment to environmental responsibility while supporting ESG reporting and corporate sustainability objectives.

Project Outcome

Long-term value

The successful delivery of the 135kWp rooftop solar installation demonstrates how existing commercial buildings can be transformed into cleaner, more energy-efficient facilities through intelligent engineering and renewable energy integration.

By combining specialist electrical engineering expertise with practical project delivery, Veridis has provided the client with a robust, future-ready energy solution that will continue delivering environmental and commercial value for decades to come.

Gallery

Project images

Get in touch

Make better use of your commercial roof space

Veridis helps organisations assess, design and deliver commercial solar PV systems that reduce energy costs, support decarbonisation and integrate with wider site energy infrastructure.